Now taking first pilot customers
Ships at sea.Everything in sight.
Certificates and surveys, planned maintenance, defects, safety inspections and owner reports, all in one Seavoria workspace. Shore staff always know which job on which vessel is coming due. Crews keep reporting when the link drops. And at month end, the data for the owner report is already there.
- Type
- Panamax bulk carrier
- LOA
- 225 m
- Breadth
- 32.26 m
- Depth
- 19.6 m
- Draught
- 14.2 m
- Seavoria
- Generated from a hull template
- High risk or overdue
- Medium risk, due or due soon
- Other open items
- No items
- Engine room middle platform1 item
- No.6 cargo hold1 item
- No.3 cargo hold2 items
- Fore peak tank1 item
Three jobs nobody should have to chase by hand
Certificate expiry lives in a register someone has to remember to check. Evidence is scattered across emails and photos. The owner report gets rebuilt from scratch every month. Seavoria keeps all three on one record.
Certificates and maintenance
Due tracking
Calendar, running hours, or whichever comes first, worked out for you. You get one alert when a survey window opens and another as expiry nears, and critical equipment sits at the top of the workbench.
Execution and review
Ship–shore evidence
Jobs go to a vessel and position, and pass to the reliever after a crew change. The crew log readings, notes and photos; shore staff check the evidence, then close the job or send it back with a reason. Nobody approves their own work.
Delivered by contract
Owner reports
Built from the records by contract, vessel and period, then reviewed and published. A published version is frozen; corrections go out as a new version with a note, and owners can still read the old one.
How many hours are left? The gauge says it plainly
The due gauge is Seavoria’s signature screen. Generation line, threshold and tolerance sit on one scale, the pointer is the latest valid reading, and the conclusion is written right next to it, such as “Due soon, 14 h to go”. No more working it out from the register.
- When the reading reaches the generation line, the work order is created. Each plan sets its own lead time.
- Due soon, due and overdue switch automatically as readings come in.
- If a job really cannot be done, request a postponement. It only applies once shore approves, and the original due date stays on record.
- Readings never go down. If one rises by more hours than have actually passed, it is stopped on the spot.
Main engine No.1 cylinder liner inspection
Every 12,500 h, generated 50 h ahead, tolerance 50 h
Due soon, 14 h to go
Last valid reading 12,412 h, 4 Nov 08:00 (China time, UTC+8)
- Not due
- Due soon
- Due
- Overdue
- Last
- This
Drag the slider to see what the crew see when they enter a reading. This reading takes effect only after shore approves and closes the job.
From the day you take over a vessel to your first owner report
Five workflows are connected from the first release. Every record carries the contract version in force when it was made, so however the contract changes later, you can still see who was responsible.
Takeover
Register the owner, contract and scope; check vessel data, equipment, certificates and technical files item by item; assign carried-over issues, then confirm the takeover.
Certificates and surveys
Alerts as soon as a survey window opens or expiry nears. Plan the survey, close findings with evidence, issue the new certificate and keep the old one on file.
Planned maintenance
Work orders raised by calendar or running hours, done and submitted on board, reviewed and closed ashore, with the maintenance history building itself.
Defects and safety findings
Find, rate, record interim measures, assign and close after review. High-risk defects need a second person to confirm.
Owner reports
Summarised by contract and period, reviewed and published by the responsible manager, with every version and delivery on record.
Ashore you see the whole fleet. On board nothing gets lost.
Shore staff, crew and owner representatives each have their own way in, and each opens straight onto their own work.
Fleet workbench
Data as of 11 Nov 09:30
| Job | Vessel | Position | Due | Status |
|---|---|---|---|---|
| Emergency fire pump test | Lanxu 03 | Chief officer | 2 days past tolerance | Returned |
| ME No.1 cylinder liner | Lanxu 07 | Chief engineer | Due soon, 14 h to go | Open |
| No.2 generator oil change | Lanxu 11 | Second engineer | Due, 30 h left | Awaiting review |
| Lifeboat release gear check | Lanxu 07 | Third officer | Due in 12 days | Open |
Vessels
Lanxu 03Synced 26 hours ago
Lanxu 07Synced 08:12
Lanxu 11Synced 09:05
ME No.1 cylinder liner
3 photos, 1.1 MB in total
Sync log
- Saved on deviceReading, note and 3 photos
- Waiting for networkSatellite link down
- SyncingUploading 1.1 MB
- SyncedReceived ashore, awaiting review
Owner report
October 2026
- PMS on-time rate
- 96%
- Jobs closed
- 42
- Open defects
- 3
- Certificates held / required
- 28 / 28
Planned maintenance
Certificates and surveys
Open items
Shore
Superintendents and planners
Overdue, due, due soon, awaiting review: one click filters the fleet, and vessels sit side by side for comparison. Any vessel that has not synced for 24 hours is flagged.
Ship
Masters and chief engineers
One-handed on a phone or tablet. No signal? Entries are saved on the device and sync when the link returns, and every record shows exactly how far it has got.
Owner
Owner representatives
Open the published monthly report: what was done this period, certificates and surveys, and what is still open. It prints as is.
Built for satellite links (design targets)
- 1 Mbps
- Simulated downlink, 700 ms round trip, 1% packet loss
- ≤ 2 s
- To open a cached work order on the simulated link
- ≤ 500 KB
- First load of the crew app shell, compressed
- 2,048 px
- Longest photo edge; compressed on the device, location removed on the server
Bulkers, tankers, box ships, offshore. One system
The core workflows work the same for every vessel type, so a mixed fleet is run in one place. Which certificates each vessel should hold and which onboarding template it uses are suggested from its type, tonnage and trading area; you confirm vessel by vessel.
- Dry bulk carriers
- Tankers
- Gas carriers
- Container ships
- General cargo and multipurpose
- Ro-ro ships
- Passenger ships
- Offshore vessels
- Tugs
- Barges
- Special and work vessels
Four hull templates
Panamax bulk carrier
LOA 225 mB 32.26 m
Panamax and Kamsarmax bulk carriers
Aft-house cargo ship (generic)
LOA 150 mB 24 m
Tankers, gas carriers, container ships, general cargo, ro-ro, passenger ships and other bulk carriers
Forward-house work vessel (generic)
LOA 80 mB 18 m
Offshore vessels and tugs
Barge (generic)
LOA 90 mB 27 m
Non-propelled barges
Type-specific work comes as optional modules you switch on when you need them. The first is offshore: DP documents and trials, lifting operations, and project mobilisation.
Your data stays in your workspace
Every ship manager gets a workspace of its own. Isolation is enforced in the database, on every business table: another company’s records cannot be read, and you cannot even tell whether they exist.
A workspace of your own
Each company has its own address and workspace. The server decides whose data a request can reach, so changing request parameters gets nobody across the line.
Access by position and vessel
Position, vessel grants and service dates decide who sees which vessel and who can take which step. Key grants and status changes are audited.
No location in photos
Photos are re-encoded on the server, and GPS and other location data are stripped before storage.
Minimal personal data
Only the crew document and health fields the service needs are collected. Access follows duty, and none of it appears in owner reports.
Data kept in China
Production data and backups are stored in mainland China by default. The recovery target is no more than one hour of data loss.
Take your data with you
After the contract ends you get 30 read-only days to export your data. Production data is then deleted within 30 days, and we confirm the deletion.
Start with one or two vessels
First customers are invited, and we go live alongside you. The best fit is a ship manager running 3 to 30 vessels. From day one you can import your data and run maintenance jobs, and the first owner report goes out before the first reporting period closes.
R1
Day one
Import vessels, equipment and documents; start using certificates and surveys, planned maintenance and defects; crews report jobs even on weak links.
R2
Before the first period closes
Your first owner report: summarised, reviewed, published and read online by owner representatives.
R3
During the pilot
Takeover checklist and carried-over items, HSEQ inspections and incident reports, authorised export and an exit drill.
Tell us about your fleet
How many vessels, which types, and how you run them today. Together we pick the pilot vessels and settle the first data set and the report template.